Select Sidearea

Populate the sidearea with useful widgets. It’s simple to add images, categories, latest post, social media icon links, tag clouds, and more.

hello@youremail.com
+1234567890

Complete Monitoring

The world's best DGA solutions going extra mile

hero_relay_control (2)

Along with DGA and bushing failures, there are also several other failures such as the main tank accounting for 30%, Tap changer accounting for 35%, and the Cooling system accounting for 5% of total failures. EPESOL provides one device solution to monitor all of these failures along with DGA and bush monitoring. MS-3000 provided by EPESOL is one of the most advance solution for both monitoring and automation. MS-3000 provides a holistic approach that not only relies on a GE’s Dissolved Gas Analysis (DGA) monitor but expands the monitoring by connecting to the other existing transformer sensors and adding functionalities and measuring devices as per customer requirements.

Going Extra Mile

Transformer Solutions beyond DGA
MS 3000
  • Combine any DGA (GE & others) and correlate with load and temperature
  • Active part supervision (e.g., core, winding, insulation, leads)
  • Bushing, OLTC and cooling system monitoring
  • Electrical Stress Detection
  • Decision Aids by using report generator and built-in simulators
DGA 900 Plus
  • Modular and retrofittable architecture using selectable standard add-on cards
  • 9 gas DGA and moisture
  • Addition of extra sensors, electronic cards and firmware algorithms
  • Bushing monitoring, partial discharge detection, OLTC monitoring, transformer models

Discover More

Single Gas  

DGA

 Transformer oil is subjected to electrical stress, and this stress can cause the oil to break down, creating gases within the transformer oil. GE single gas DGA can track

Multi Gas

DGA

 Transformers are the most critical assets of the power system, and there continuous monitoring is required. Single gas DGA on transformer oil can analyze much about the transformer

Portable

DGA

EPESOL offers for the first time in Pakistan an on-site DGA facility through its state-of-the-art on-site DGA test-set, Transport . The second-generation Transport is a compact

Bushing

Monitoring

Bushing failure is one of the leading cause of transformer failure, accounting for 15% of the total failures. Faulty insulation is the principal cause of bushing failure. Humidity and oil